The Time Machine gets a P-Mag

Progress was made!  Final resin wipe on the aux tank, and the fuel cap flange installed on the lid means it's ready for it's final cure cycle, the closeout bond and overwrap plies to contain that lead!
 
 
The Tango got some advanced electronics installed over the weekend as well.  The retrofit from a Slick mag to the P-Mag model from E-Mag Ignitions (www.emagair.com) has been coming along quickly.  The change requires the addition of one power wire from the main buss to the P-Mag, but everything else is already there; the p-lead and ground are kept from the original mag installation, and that's it.  Since the Tango runs a Vertical Power VP-X Pro, the circuit breaker is already there, so all I had to do was run the wire to a new switch on the panel, and out to the mag.  The switch provides a means to test the P-Mag's self powering feature during the run-up.  That's right, variable timing that operates identical to a magneto above 900 rpm!
 
 
Rat's nest?
 
Don't forget to stop by the E-Mag booth at OSH14, Hangar D, Aisle D, Booth 4061.  Say hi to Brad, and tell him you saw it on the TangoTimeMachine!
 

 

Wednesday, June 25, 2014

Tango 2 Aux Tank Progress

I've been working on a 15 gallon aux tank for the #TangoTimeMachine.  I sized the divinycell, bondo- tagged it together and micro wiped the inside radiuses for the first cure.
 
Cure two was covering the inside of the tank with 2 plies of fiberglass, followed by grinding off the corners, beveling the core, and covering the outside in 1 ply of fiberglass for the 3rd cure cycle.
 
During the process, I was getting a little nervous about having made the tank big enough.  I had measured the volume and run the numbers several times, but with the tank sitting next to a 5 gallon gas tank (the kind you buy when you run out of gas), it didn't seem big enough.  Yesterday I finally had to opportunity to get a rough volume test, and it was able to hold 4 full 5 gallon buckets of water.  Whew!
 
Last night I layed up the top part, and the closeout flanges around the inside top of the tank.


 
Next will be fitting the tank with the fuel pickup line, and making sure the core areas are sealed before closing out the top of the tank.
 
Build time to date: 5 hrs.